All countries

Africa · TZA

Tanzania

Songo Songo gas and a delayed LNG. Julius Nyerere hydropower is the new dam.

importer

Oil production

0.0 mb/d

0.1 mb/d demand

Net oil

-0.1 mb/d

Import gap

Gas production

6 bcm

Net +1 bcm

O&G rent

1.1%

Share of GDP

Oil balance

Production versus demand, 2025, million barrels per day.

Production0.0 mb/d
Consumption0.1 mb/d

Gas balance

Production versus demand, 2025, billion cubic metres.

Production6.0 bcm
Consumption5.0 bcm

Proven oil

0 bn bbl

Gas reserves

0.0 tcm

Refining

0.0 mb/d

LNG

No LNG

Hydrocarbon mix

Oil versus gas in this country’s oil-and-gas demand (oil-equivalent).

  • Oil31%
  • Gas69%

Economy

Domestic gas-to-power came first. LNG to Asia is still a FID, not a cargo.

GDP
$0.1 tn
Population
69.0 m
Oil intensity
0.4 bbl /$1k
Oil & gas rent
1.1% GDP
Hydrocarbon trade
3.4% GDP
Fiscal breakeven
$30 oil shock
-10.4 pp GDP
Club
Independent

Projected oil demand

Regional IEA WEO 2025 oil pathways applied to this country’s 2025 baseline. STEPS 2035 demand 0.1 mb/d (net -0.1) versus NZE 0.1 mb/d (net -0.1).

Scenario2025203020352050
Stated Policies0.10.10.10.1
Net Zero 20500.10.10.10.0
Current Policies0.10.10.10.1

Same region